The Ava airport runway was graded and compacted last Thursday before asphalt could be put down this week.
The apron at the Bill Martin Memorial Airport was completely removed and a new base will be put down before the asphalt is applied.
A tanker truck sprays water on the runway to maintain a moisture content necessary for proper compaction of the runway base. That moisture content must be maintained until the asphalt is put down.